01 / Utility operations

Make the right pole easier to identify.

A field-visible identifier pilot built around reporting accuracy, reversibility and a clean operational handoff.

Request a detailed brief
Independent pilot proposal · Not commissioned or deployed
Illustrative streetlight identifier shown in an urban contextConcept rendering / not an authorized installation
PROPOSED REFERENCE / NOT RESULTS
2,000proposed pole locations
12 weeksproposed test window
≥20%target improvement, not achieved
01 / THE CONDITION

What needs to be understood?

A malfunctioning streetlight is visible. The correct pole reference is not always obvious to the person reporting it. Without an unambiguous identifier, a simple report can require avoidable clarification.

02 / THE INTERVENTION

What is being proposed?

Test a reversible, field-visible tag along selected residential corridors. Preserve existing asset numbering; do not assume IT integration or database changes. A QR element, if used, would route to an existing public reporting resource.

03 / THE BOUNDARY

What is inside the test?

2,000 proposed pole locations across selected corridors; 12-week proposed evaluation window. Physical design, permissions, installation responsibilities and final sample plan remain subject to utility review.

04 / THE MEASURE

How would we know?

Before-and-after rate of correct pole-ID citation; day/night legibility checks; installation and removal effort; field feedback; any unintended reporting consequences.

05 / THE DECISION

What would the result decide?

Does improved identification justify an institution-led next phase, a design revision, or discontinuation? A ≥20% improvement in correct ID citation is the proposed target, not a measured outcome.

An example of the evidence logic

The question, made measurable.

Illustrative evaluation structure. Actual implementation, criteria and results require the institution’s review and authority.

MEASUREMENT LOGIC / PROPOSED
BASELINE

Share of reports with the correct ID before the intervention

AFTER TEST

Share with the correct ID under the proposed treatment

Measure the change. Do not assume success.
DISCLOSURE / READ BEFORE INTERPRETING THIS CONCEPT

No utility authorization or Toronto Hydro endorsement is implied. The displayed product treatment is illustrative, not a final approved technical specification.

Discuss this proposal